Draft guideline
Back to topOn 27 May 2021 the AER published its draft Ring-fencing Guideline (Electricity distribution) (Version 3) and Explanatory statement.
Stakeholder forum
Back to topThe AER hosted an online forum on 9 June 2021 for interested stakeholders. The slides used for these forums are now available.
Documents (3) | Author |
---|---|
AER - Stakeholder forum slides - 9 June 2021 ( PDF 291.83 KB ) | AER |
Australian Energy Council - Stakeholder forum slides - 9 June 2021 ( PDF 808.41 KB ) | Australian Energy Council (AEC) |
Energy Networks Australia - Stakeholder forum slides - 9 June 2021 ( PDF 574.3 KB ) | Energy Networks Australia (ENA) |
Submissions
Back to topOn 27 May the AER published its draft Ring-fencing Guideline and explanatory statement. Submissions on the draft guideline closed on 8 July 2021.
Late submissions
Back to topThe following submissions on our draft guideline were received after submissions closed on 8 July 2021.
Consultation paper
Back to topIn response to stakeholder submissions, on 27 August 2021 the AER sought feedback on two additional minor amendments to the draft Guideline as detailed in the consultation note.
Documents (1) | Author |
---|---|
AER - Draft Ring-fencing Guideline (Electricity distribution) - Consultation note - August 2021 ( PDF 250.64 KB ) | AER |
Submissions - Consultation paper
Back to topFeedback on the consultation note closed on 14 September 2021.
Late submissions - Consultation paper
Back to topThe submissions below were received after the closing date of 14 September 2021.
Documents (1) | Author |
---|---|
Red and Lumo Energy -Electricity Distribution Ring-fencing Guideline Consultation Note Submission- 16 September 2021 ( PDF 125.36 KB ) | Red-Lumo Energy |