Application
Back to topOn 3 September 2018, SA Power Networks submitted to the AER a waiver application under clause 5.2 of the Electricity ring-fencing guideline 2017 (Guideline).
Documents (1) | Author |
---|---|
SA Power Networks - Waiver Extension Application - 3 September 2018 ( PDF 2.21 MB ) | SA Power Networks |