The Australian Energy Regulator (AER) has granted Australian Gas Networks Limited (AGN) exemptions from gas ring-fencing obligations for its Hydrogen Park South Australia (HyP SA) and Hydrogen Park Gladstone (HyP Gladstone) hydrogen trial projects.
The exemptions allow AGN to continue operating HyP SA and HyP Gladstone without creating a separate business entity under section 139, and share marketing staff across all its projects under section 140 of the National Gas Law.
The exemptions commence on 30 November 2026, when the trial projects’ existing deemed exemptions under the National Gas Rules expire, and remain in effect until 30 November 2031. The five-year period balances regulatory certainty with the need to potentially revisit the exemptions if there are future relevant developments in the renewable gas market.
The exemptions are subject to the below conditions to ensure the AER remains informed of potential material changes. Specifically, AGN will be required to notify the AER within 15 business days of:
- a material change in the nature or scale of either project
- a formal third-party request to connect or access the Gladstone or Tonsley distribution networks for a renewable gas production facility
- any material change to its internal controls relevant to either project, including controls that substantially replicate the associate contract requirements, and provide updated documentation of those controls.
AGN must provide the AER with the separate accounts for HyP Gladstone and HyP SA, along with the methodology used by AGN to allocate costs to HyP Gladstone and HyP SA. The accounts and the cost allocation methodology must be prepared on an annual basis and provided to the AER within six months of the conclusion of the annual reporting period.
The AER published its draft decision on 16 October 2026 and has considered the issues raised during the consultation when making this final determination.