Our approval role

A cost pass through event is one that occurs beyond the reasonable control of a network business and has not been accounted for in its current 5-year revenue determination.

Examples can include new statutory obligations imposed on the business or extensive damage to infrastructure caused by a natural disaster.

They can occur at any time during a regulatory control period.

Under the National Electricity Rules, network business can submit a cost pass through application to the AER to recover its efficient costs incurred by the event.

We undertake a rigorous assessment of the application and make a cost-recovery determination based on the principle that consumers should pay no more than necessary for safe and reliable energy.

Historical cost pass through decisions are archived and are available by emailing AERinquiryataer [dot] gov [dot] au (aerinquiry[at]aer[dot]gov[dot]au).

Cost pass through decisions

Results

TasNetworks - Network support pass through 2024-25

The AER has determined TasNetworks' 2024-25 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2026-27
Type
Cost pass throughs
Sector
Electricity
Status
Current

Jemena – Cost pass through applications – MITE, ASMD, VEBM2

Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events.
Type
Cost pass throughs
Sector
Electricity
Status
Open

Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change

Applications are to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Sector
Electricity
Status
Open

Powerlink - Network support pass through 2024-25

The AER has determined Powerlink's 2024-25 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2026-27
Type
Cost pass throughs
Sector
Electricity
Status
Current

Roma to Brisbane Pipeline – Cost Pass Through – 2025-26 Tax Change Event

The AER has made a decision on APA’s Roma to Brisbane Pipeline tax change event cost pass through related to the 2025-26 National Energy Market Regulation fee.
Type
Cost pass throughs
Sector
Gas
Status
Current

Ausgrid’s distribution cost pass through application – January 2025 storm

The AER has made a determination on Ausgrid's cost pass through application to recover costs incurred due to a severe storm event January 2025
Type
Cost pass throughs
Sector
Electricity
Status
Current