South Australia: January - March 2024

Sector: 
Segment: 
Commencement date: 
8 January 2021
Regulatory period: 
8 January 2024 to 15 March 2024
Status: 
AER reference: 
64876

Overview

The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM). In particular it encourages retailers, and some large energy users, to establish contracts for their share of demand for a prescribed period. The RRO can be triggered if the Australian Energy Market Operator (AEMO) identifies a reliability gap in a region of the NEM as part of its Electricity Statement of Opportunities. The South Australia Minister also has the power to do this (under NEL Part 7A 19B (1)) if it appears to the Minister on reasonable grounds that there is real risk that the supply of electricity in all or part of South Australia may be disrupted to a significant degree on 1 or more occasions during a period in the instrument.

On 7 January 2021, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2024.

Under South Australia’s declaration, the details of the prescribed period are each working weekday from 8 January 2024 – 15 March 2024 for the trading periods between 3 PM and 9 PM EST.

Market Liquidity Obligation

The Market Liquidity Obligation (MLO) is a market making requirement designed to facilitate transparency and liquidity in the trading of electricity futures contracts relating to a forecast reliability gap. The MLO operates between T-3 and T-1 when the RRO is triggered. MLO generators under the MLO are required to post bids and offers, with a maximum spread, on an approved exchange for standardised products that cover the period of the gap.

In South Australia the MLO generators are AGL, Origin and Engie. The MLO begins on 14 January 2021.