Step:
Description:
On 10 September 2021, the AER made a draft determination to revise several cost thresholds under clause 5.15.3 of the National Electricity Rules.
Documents (1) | Author |
---|---|
AER - Draft determination - Cost thresholds review - 10 September 2021 ( PDF 294.6 KB ) |