On 5 August 2011, the AER granted the Applicants an exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the National Electricity Rules. The exemption was granted under clause 2.5.1 of the NER in accordance with the AER's former Electricity NSP Registration Exemption Guideline, and is subject to the conditions set out in the Exemption Instrument.
Type
                  
            Sector
          Electricity
              Segment
          Distribution
                  Transmission
              Region
          Victoria
              Status
                  Current
            Categories
          Individual exemption
              Classes
          NRI
              Notice status
                  Current notice
            Effective date
                  Facility description
                  The Exemption applies to the high voltage connection and transmission system connecting the Victorian desalination plant to the Cranbourne Terminal Station. The connection is a dedicated supply line to the desalination plant and the associated booster pump station.
Registrants
          Secretary of the Department of Sustainability and Environment
                  State of Victoria
                  Melbourne Water Corporation
              Address
                  Victorian Desalination Plant
VIC
Australia
AER reference
          AER-N 0001/11
              Key Documents
Victorian Desalination Project NSP Exemption Application
Content type
                  Document
            Victorian Desalination Project NSP Exemption Instrument
Content type
                  Document