Guideline
Back to topOn 30 August 2019 the AER released the interim market liquidity obligation guidelines.
Documents (1) | Author |
---|---|
AER - Interim market liquidity obligation guidelines - August 2019 ( PDF 461.35 KB ) | AER |
Final determination - Interim market liquidity obligation guidelines
Back to topOn 30 August 2019 the AER released the final determination – interim market liquidity obligation guidelines, which responds to issues raised by stakeholders submissions through our consultation.
Documents (1) | Author |
---|---|
AER - Final determination - Interim market liquidity obligation guidelines - August 2019 ( PDF 245.83 KB ) | AER |
Final determination - Deemed MLO generators and MLO groups
Back to topThe Rules deem MLO generators and MLO groups for the first two years of the RRO’s operation. The Rules provide for the AER to make a determination to add or remove generation capacity from MLO groups during the period where generators are deemed. The following determinations set out the changes made to the deemed MLO groups since the transitional Rules were created on 1 July 2019.
Documents (2) | Author |
---|---|
AER - Determination - Deemed MLO generators (Vic) - August 2019 ( PDF 210.2 KB ) | AER |
AER - Determination - Deemed MLO groups (SA and QLD) - June 2020 ( PDF 281.89 KB ) | AER |