AER
Author for
AER - Predetermination Conference Directlink Presentation pack - 14 October 2024
Authors
AER
Content type
Document
AER - Predetermination Conference SA Power Networks Presentation pack - 14 October 2024
Authors
AER
Content type
Document
Elanor Funds Management Limited ATF Tweed Heads Property Trust - Retrofit - Notice of Acceptance
Authors
AER
Content type
Document
AER - Low-voltage Network Visibility - Summary of neighbourhood battery trials
Authors
AER
Content type
Document
AER - Predetermination Conference Ergon Energy and Energex Presentation pack - 10 October 2024
Authors
AER
Content type
Document
AER - Predetermination Conference Ergon Energy and Energex Presentation pack - 10 October 2024
Authors
AER
Content type
Document
Notice of extension to Power and Water Corporation - gas ring fencing exemption application - 4 October 2024 - Redacted
Authors
AER
Content type
Document
AER - Draft System Security Network Support Payment Guideline - October 2024
Authors
AER
Content type
Document
AER - Draft guidance - Efficient management of system strength framework - 9 October 2024
Authors
AER
Content type
Document
AER - Jemena Gas Networks' public forum - Combined presentation slides - 2 September 2024
Authors
AER
Content type
Document
AER Letter to Flipped Energy Australia Pty Ltd - Grant of electricity retailer authorisation
Authors
AER
Content type
Document
AER Submission to the Directions Paper on Accelerating smart meter deployment
We made a submission to the AEMC's Directions Paper on the Accelerating smart meter deployment rule change. The submission was sent on 19 September 2024.
Authors
AER
Content type
Document
AER - Rebidding and Technical Parameters Guidelines - updated October 2024
Authors
AER
Content type
Document
AER - Generator notice of closure exemption guidelines - updated October 2024
Authors
AER
Content type
Document
AER - Draft Decision - Overview - Directlink - 2025-30 Transmission revenue proposal - September 2024
Authors
AER
Content type
Document
AER - Draft Decision Attachment 1 - Maximum allowed revenue - Directlink - 2025-30 Transmission revenue proposal - September 2024
Authors
AER
Content type
Document