On 22 August 2019, Powercor submitted an application to the AER seeking a determination, with respect to the Victorian State regulatory requirement to install Rapid Earth Current Fault Limiters (REFCLs), that funding for a contingent project be approved and their maximum allowed revenue be adjusted in accordance with clause 6.6A.2 of the NER.
Application
Powercor - REFCL T3 application cover letter v1.0 - 22 August 2019
Content type
Document
Powercor - PAL PUBLIC CPA3 REFCL application - 22 August 2019
Content type
Document
Supporting information
Powercor - REFCL3.01 Ararat (ART) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.02 Corio (CRO) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.03 Hamilton (HTN) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.04 Koroit (KRT) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.05 Merbein (MBN) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.06 Stawell (STL) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.07 Terang (TRG) functional design scope - v1.0
Content type
Document
Powercor - REFCL3.08 Bushfire Mitigation Plan 20 December 2018
Content type
Document
Powercor - REFCL3.09 Implementation and optimisation of REFCL systems rev 0.4
Content type
Document
Models
Powercor - REFCL3_MOD.01 - Expenditure build-up model (tranche three) - 22 August 2019
Content type
Document
Powercor - REFCL3_MOD.02 - Amended PTRM - 22 August 2019
Content type
Document
Powercor - REFCL3_MOD.04 - Amended REPEX model - 22 August 2019
Content type
Document
Submissions
-
Submissions in response to Powercor's contingent project application closed on 27 September 2019.
Jill Porter - Submission on Powercor contingent project Tranche 3 installation of REFCL- 27 September 2019
Content type
Document
Victorian Minister for Energy Environment and Climate Change - Submission to the AER on Powercor Tranche 3 Contingent Project Application - 12 October 2019
Content type
Document
Project administration - Extension of decision time
On 24 September 2019, the AER issued a notice to Powercor to extend the deadline for making a decision in accordance with clause 6.6A.2(j) of the NER. The new date for the decision is on or before 13 January 2020.
AER - Extension of time limit - Powercor contingent project application (REFCL tranche 3) - 24 September 2019