Results
16 result(s), displaying 1 to 12
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2015-16
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - negative cost pass through - carbon price removal
Type
Cost pass throughs
Status
Historical
AusNet Services - Cost pass through - easement land tax 2015
Type
Cost pass throughs
Status
Historical
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current