Results
74 result(s), displaying 37 to 48
Powercor - Annual pricing 2021
On 11 November 2020, the AER approved Powercor's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
United Energy - Annual pricing 2021
On 11 November 2020, the AER approved United Energy's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current