Results
285 result(s), displaying 277 to 285
Essential Energy - Determination 2024–29
Essential Energy electricity revenue determination 2024-29
Type
Determinations
Status
Current
Ausgrid - Determination 2024–29
Ausgrid electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open
Waratah Super Battery – SIPS battery service
Read our determination on the amounts to be paid to Transgrid for the System Integrity Protection Scheme battery service component of the WSB project.
Type
Determinations
Status
Current
Ergon Energy Ring-fencing Waiver Application - Shared Branding - May 2025
Ergon Energy Network is seeking a waiver to allow them to continue to use similar naming and branding as Ergon Energy Retail
Type
Ring-fencing
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
Hunter Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open