Results
515 result(s), displaying 505 to 515
Evoenergy (ActewAGL) - Determination 2024–29
Evoenergy revenue determination for the 2024–29 period
Type
Determinations
Status
Current
APTNT - Revocation of ring-fencing exemption
The AER has made a final decision to revoke an exemption granted to APT Pipelines NT Pty Ltd from ring-fencing requirements under the National Gas Law.
Type
Ring-fencing
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open
CitiPower, Powercor, and United Energy - Ring-fencing waiver - Electric vehicle charging infrastructure
The AER invites stakeholders to provide feedback on CPU’s application for a waiver from the Ringfencing guideline (electricity distribution) to provide EVCI.
Type
Ring-fencing
Status
Open
Ergon Energy Ring-fencing Waiver Application - Shared Branding - May 2025
Ergon Energy Network is seeking a waiver to allow them to continue to use similar naming and branding as Ergon Energy Retail
Type
Ring-fencing
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
TasNetwork’s (distribution) September 2024 storm cost pass through application
Type
Cost pass throughs
Status
Open
Hunter Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open