Results

Murraylink - Transmission Determination 2028-33

The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Sector
Electricity
Status
Open

ElectraNet - Transmission Determination 2028-33

The AER will make a determination of the maximum amount of revenue that ElectraNet can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Sector
Electricity
Status
Open

Transgrid - Transmission Determination 2028-33

The AER will make a determination of the maximum amount of revenue that Transgrid can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Sector
Electricity
Status
Open

Powerlink Transmission - Determination 2027-2032

The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Sector
Electricity
Status
Open

AusNet Services Transmission - Determination 2027-32

On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Sector
Electricity
Status
Open

Hunter-Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)

Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Sector
Electricity
Status
Current