Sidebar navigation
Determinations and Access Arrangements
Results
Power and Water Corporation - Distribution Determination 2029-34
The AER must make an electricity distribution determination for Power and Water Corporation for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open
Ausgrid - Distribution Determination 2029-34
The AER must make an electricity distribution determination for Ausgrid for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open
Endeavour Energy - Distribution Determination 2029-34
The AER must make an electricity distribution determination for Endeavour Energy for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open
Essential Energy - Distribution Determination 2029-34
The AER must make an electricity distribution determination for Essential Energy for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open
TasNetworks - Distribution and Transmission Determinations 2029-34
The AER must make an electricity distribution and transmission determinations for TasNetworks for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open
Evoenergy - Distribution Determination 2029-34
The AER must make an electricity distribution determination for Evoenergy for the 1 July 2029 to 30 June 2034 regulatory control period.
Type
Determinations
Status
Open