Results

Powerlink Transmission - Determination 2027-2032

The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Sector
Electricity
Status
Open

AusNet Services Transmission - Determination 2027-2032

The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Sector
Electricity
Status
Open

Kurri Kurri Lateral Pipeline classification decision

On 16 May 2025, we published the final decision for to classify the Kurri Kurri Lateral Pipeline (KKLP) classification.
Type
Determinations
Sector
Gas
Status
Current

Energex - Determination 2025–30

Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Sector
Electricity
Status
Open

Main Central-West Orana Renewable Energy Zone network project (contestable)

Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Sector
Electricity
Status
Current

Waratah Super Battery – Network augmentation and SIPS control system

Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Sector
Electricity
Status
Current