The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect. The exemption was granted under clause 2.5.1 of the NER in accordance with the AER’s Network Exemptions Guideline and is subject to a number of conditions.
You can find the current version of the Network Exemptions Guideline on the Network exemptions page.
Network conversion (creation of an embedded network at a site with existing energy consumers)
On 3 June 2025, the AER issued Trustee for Energy Bay Oscar Fund / ABN 86 236 720 454 and Stockland Trust Management Limited / ABN 86 001 900 741 a Notice of Acceptance permitting registration of network exemptions for this site having met the network conversion eligibility criteria specified in the Network Exemptions Guideline.
The registrants of this exemption must comply with the network conversion conditions set out in the Network Exemptions Guideline, in addition to the core conditions for the registered exemption classes.
The registrant nominated an effective date of 1 July 2025.