Results
739 result(s), displaying 733 to 739
APTNT - Revocation of ring-fencing exemption
The AER has made a final decision to revoke an exemption granted to APT Pipelines NT Pty Ltd from ring-fencing requirements under the National Gas Law.
Type
Ring-fencing
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open
APA Victorian Transmission System - Access arrangement 2023–27
Gas access arrangement for APA Victorian Transmission System for the 2023–27 regulatory period
Type
Access arrangements
Status
Current
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open