PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
Type
Network exemptions
Status
Current
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
TasNetwork’s (distribution) September 2024 storm cost pass through application
Type
Cost pass throughs
Status
Open
Hunter Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Open
REAL UTILITIES FORTITUDE VALLEY PTY LIMITED - BRUNSWICK & CO network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current