Results
17070 result(s), displaying 17065 to 17070
TasNetworks distribution cost pass through application – August-September 2024 storm
AER's decision on TasNetworks' (distribution) September 2024 storm cost pass through application.
Type
Cost pass throughs
Status
Current
Enabling Central-West Orana Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Transgrid's proposal for the Enabling Central-West Orana REZ Network Infrastructure Project (the CWO Enabling RNIP)
Type
Determinations
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN (SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Hunter-Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Current
Transgrid system security contract review application - October 2025
Transgrid's application seeks an AER determination on whether the expenditure for proposed system security network support services is prudent and efficient.
Type
System security contract reviews
Status
Open