Powerlink - Network support pass through 2024-25
The AER has determined Powerlink's 2024-25 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2026-27
Type
Cost pass throughs
Status
Current
Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change
Applications are to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Status
Open
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events.
Type
Cost pass throughs
Status
Open
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025.
Type
Cost pass throughs
Status
Open
Transgrid - 2024-25 Network support pass through application
Transgrid has requested a determination on its 2024-25 network support pass through application.
Type
Cost pass throughs
Status
Current
INA Operations Pty Limited - INGENIA LIFESTYLE SUNBURY network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
Evoenergy - Cost pass through application - Flexible trading arrangements rule change
Evoenergy's application is to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Status
Open
AusNet Services (Distribution) - Cost allocation method 2025
On 14 July 2025 the AER approved the revised CAM submitted by AusNet Services in accordance with chapter 6 of the National Electricity Rules.
Type
Cost allocation methods
Status
Current
EVERGY PTY LTD - ARNCLIFFE CENTRAL network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2026−27
View our decision on the maximum amount electricity distributors can pass through to consumers in 2026-27 as costs for the NSW infrastructure roadmap
Type
Cost pass throughs
Status
Current
2026 Review of the Retailer of Last Resort guidelines and plan
The AER is reviewing the RoLR guidelines and plan to include recent amendments to the National Energy Retail Law.
Type
Reviews
Status
Open
Jemena Gas Networks - 2026–27 tariff variation notice
Jemena Gas Networks (JGN) proposed new network prices to apply to its NSW gas network for 2026–27.
Type
Tariff variations
Status
Open