Results
17810 result(s), displaying 17773 to 17784
AusNet Services - Determination 2026–31
AusNet Services is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change
Applications are to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Status
Current
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events.
Type
Cost pass throughs
Status
Current
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025.
Type
Cost pass throughs
Status
Current
Evoenergy - Cost pass through application - Flexible trading arrangements rule change
Evoenergy's application is to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Status
Current
AusNet Services – 2026–27 pricing proposal
AusNet Services proposed new network prices to apply to its Victorian electricity distribution network for 2026–27.
Type
Pricing proposals
Status
Open
CitiPower – 2026–27 pricing proposal
CitiPower proposed new network prices to apply to its Victorian electricity distribution network for 2026–27.
Type
Pricing proposals
Status
Open
Jemena – 2026–27 pricing proposal
Jemena proposed new network prices to apply to its Victorian electricity distribution network for 2026–27.
Type
Pricing proposals
Status
Open
Powercor – 2026–27 pricing proposal
Powercor proposed new network prices to apply to its Victorian electricity distribution network for 2026–27.
Type
Pricing proposals
Status
Open
United Energy – 2026–27 pricing proposal
United Energy proposed new network prices to apply to its Victorian electricity distribution network for 2026–27.
Type
Pricing proposals
Status
Open
Draft FERM Scheme Regulator guideline
We have published the FERM Scheme Regulator guideline which sets out the process and method for how we make contribution determinations for the SA FERM scheme.
Type
Reviews
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open