Results
17996 result(s), displaying 17977 to 17988
AusNet Gas Services - Access arrangement 2028–33
Gas access arrangement for AusNet Gas Services for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Australian Gas Networks (Victoria and Albury) - Access arrangement 2028–33
Gas access arrangement for Australian Gas Networks (Victoria and Albury) for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Multinet Gas Networks - Access arrangement 2028–33
Gas access arrangement for Multinet Gas for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Transgrid - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Transgrid can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
ElectraNet - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that ElectraNet can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Murraylink - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
Powerlink cost pass through application – SoCI Act reforms
On 30 September 2025, Powerlink submitted a cost pass through application seeking to recover the costs it had incurred as a result of the SoCI Act reforms.
Type
Cost pass throughs
Status
Current
Essential Energy – Cost pass through application – EBM
Essential Energy submitted an application seeking to recover costs relating to the NSW Emergency Backstop Mechanism.
Type
Cost pass throughs
Status
Current
Endeavour Energy – Cost pass through application – EBM
Endeavour Energy submitted an application seeking to recover costs relating to the NSW Emergency Backstop Mechanism.
Type
Cost pass throughs
Status
Current
Ausgrid – Cost pass through application – EBM
Ausgrid submitted an application seeking to recover costs relating to the NSW Emergency Backstop Mechanism Order.
Type
Cost pass throughs
Status
Current
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open