Overview

Draft guideline

On 14 April 2022, the AER released an interim draft Ring-fencing guideline (Electricity transmission) and explanatory statement. The draft guideline re-issues the guideline under clause 6A.21 of the NER in substantively the same form as version 2. 

AER - Draft - Interim Ring-fencing guideline (electricity transmission) - April 2022

Authors
AER
Content type
Document

AER - Draft - Interim Ring-fencing guideline (electricity transmission) - Tracked changes - April 2022

Authors
AER
Content type
Document

AER - Draft - Interim Ring-fencing guideline (electricity transmission) - Explanatory statement - April 2022

Authors
AER
Content type
Document

Submissions

-

Submissions on the draft guideline closed on 31 May 2022. 

ENA - Draft - Interim Ring-fencing guideline (electricity transmission) - Submission - 31 May 2022

Authors
ENA
Content type
Document

Ausgrid - Draft - Interim Ring-fencing guideline (electricity transmission) - Submission - 31 May 2022

Authors
Ausgrid
Content type
Document

TasNetworks - Draft - Interim Ring-fencing guideline (electricity transmission) - Submission - 27 April 2022

Authors
TasNetworks (Transmission)
Content type
Document

Late submissions

Iberdrola - Draft - Interim Ring-fencing guideline (electricity transmission) - Submission - 6 June 2022

Authors
Iberdrola
Content type
Document