Overview

Draft determination - 2015 cost thresholds review for the regulatory investment test

On 2 September 2015 the AER published the draft determination for the 2015 cost thresholds review.

AER Draft determination - Cost thresholds review for the regulatory investment test - 2 September 2015 View details

2015 cost thresholds review - draft determination.pdf
PDF (223.9KB)
2015 cost thresholds review - draft determination.DOCX
DOCX (222.58KB)
Authors
AER
Content type
Document

Submissions - on the 2015 cost thresholds review draft determination

-

Submissions to the 2015 cost thresholds review draft determination closed on 9 October 2015.

CitiPower and Powercor submission on 2015 cost thresholds review draft determination - 9 October 2015

Authors
Powercor Australia
CitiPower
Content type
Document

Energy Networks Association submission on 2015 cost thresholds review draft determination - 9 October 2015

Authors
Energy Networks Association (ENA)
Content type
Document

Grid Australia submission on 2015 cost thresholds review draft determination - 7 October 2015

Authors
Grid Australia
Content type
Document