Overview

Draft determination

On 11 September 2018, the AER made a draft determination to revise several cost thresholds under clause 5.15.3 of the National Electricity Rules.

AER - Draft determination - Cost thresholds review - 11 September 2018

Authors
AER
Content type
Document

Submissions - Cost threshold review

-

Submissions on our draft determination closed on 16 October 2018.

CitiPower, Powercor, United Energy - Submission to AER draft determination on cost threshold review - 10 October 2018

Authors
Powercor Australia
United Energy Distribution
CitiPower
Content type
Document

Energy Queensland - Submission to AER draft determination on cost threshold review - 16 October 2018

Authors
Energy Queensland Limited (EQL)
Content type
Document