Sector:
Segment:
Status:
Region:
Commencement date:
28 March 2008
Effective date:
29 August 2008
Service provider/Asset:
Overview
ElectraNet's cost allocation method (CAM) governs the manner in which ElectraNet is allowed to allocate costs to the transmission services that it provides. The allocation of costs between the services is requried to accurately represent the costs incurred in providing those services. This prevents cross-subsidisation between the transmission and other services that ElectraNet provides.
The assessment of ElectraNet's CAM was based on the advice of McGrathNicol Corporate Advisory. On 29 August 2008, the AER approved ElectraNet's CAM in accordance with chapter 6A of the National Electricity Rules, concluding that it was consistent with the AER's Cost Allocation Guidelines.
Key documents
Documents | Author |
---|---|
ElectraNet - cost allocation method ( PDF 189.71 KB ) | ElectraNet |
ElectraNet - cost allocation method - final decision ( PDF 130.04 KB ) | AER |
ElectraNet - review of cost allocation method - McGrathNicol ( PDF 1.59 MB ) | McGrathNicol |