Decision - Transitional determination
Back to topOn 28 March 2014 the AER released its transitional determination on TransGrid’s maximum allowable revenue for the transitional regulatory control period 1 July 2014 to 30 June 2015.
Models
Back to topDocuments (1) | Author |
---|---|
AER transitional decision - TransGrid post tax revenue model (PTRM) ( XLS 10.21 MB ) | AER |