Murraylink - electricity transmission interconnector

Sector: 
Segment: 
Owner: 
Energy Infrastructure Investments (Marubeni 50%, Osaka Gas 30%, APA Group 20%)
Operator: 
APA Group
Covered by regulation: 
Yes
Source: 
State of the Energy Market 2014

Notes

Current regulatory period: 1 July 2013 - 30 June 2018

Murraylink is a 180km, HVDC 220 MW transmission link between Red Cliffs in Victoria and Berri in South Australia.  

Line Length (km)
180

Not all interconnectors are listed. The unlisted interconnectors, which form part of the state based networks, are Heywood (Victoria-South Australia), QNI (Queensland-New South Wales) and New South Wales-Victoria.