Results
840 result(s), displaying 181 to 192
TasNetworks - Annual pricing 2023–24
TasNetworks submitted to the AER an annual pricing proposal for its Tasmanian distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
United Energy - Annual pricing 2023–24
United Energy submitted to the AER an annual pricing proposal for its Victorian distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2023–24
Jemena submitted to the AER an annual tariff variation notice for its New South Wales gas distribution network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2023–24
Australian Gas Networks submitted to the AER an annual tariff variation notice for its South Australian gas distribution network for the period 1 July 2023 to 3
Type
Tariff variations
Status
Historical
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
TasNetworks - Network support pass through 2021–22
AER's decision on TasNetworks' Network support pass through 2021–22
Type
Cost pass throughs
Status
Historical
ElectraNet - Network support pass through 2021–22
AER's decision on ElectraNet's cost pass through application
Type
Cost pass throughs
Status
Historical
Powerlink - Network support pass through 2021–22
AER's decision on Powerlink's cost pass through application.
Type
Cost pass throughs
Status
Historical
Transgrid - Network support pass through 2021–22
AER's decision on Transgrid's cost pass through application.
Type
Cost pass throughs
Status
Historical
Murraylink - Connection charge pass through 2021–22
AER's decision on Murraylink’s cost pass through application.
Type
Cost pass throughs
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current