Results
825 result(s), displaying 1 to 12
TasNetworks distribution cost pass through application – August-September 2024 storm
AER's decision on TasNetworks' (distribution) September 2024 storm cost pass through application.
Type
Cost pass throughs
Status
Current
Ausgrid’s distribution cost pass through application – January 2025 storm
The AER has made a determination on Ausgrid's cost pass through application to recover costs incurred due to a severe storm event January 2025
Type
Cost pass throughs
Status
Current
TasNetworks - Network support pass through 2024-25
The AER has determined TasNetworks' 2024-25 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2026-27
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2024-25
The AER has determined Powerlink's 2024-25 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2026-27
Type
Cost pass throughs
Status
Current
Transgrid - 2024-25 Network support pass through application
Transgrid has requested a determination on its 2024-25 network support pass through application.
Type
Cost pass throughs
Status
Current
AusNet Services (Distribution) - Cost allocation method 2025
On 14 July 2025 the AER approved the revised CAM submitted by AusNet Services in accordance with chapter 6 of the National Electricity Rules.
Type
Cost allocation methods
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2026−27
View our decision on the maximum amount electricity distributors can pass through to consumers in 2026-27 as costs for the NSW infrastructure roadmap
Type
Cost pass throughs
Status
Current
Hunter-Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Current
Enabling Central-West Orana Renewable Energy Zone Network Infrastructure Project (non-contestable)
The AER made its final decision on Transgrid’s CWO Enabling Project.
Type
Determinations
Status
Open
Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change
Applications are to recover costs incurred due to the flexible trading arrangements rule change.
Type
Cost pass throughs
Status
Current
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events.
Type
Cost pass throughs
Status
Current
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025.
Type
Cost pass throughs
Status
Current