Results
825 result(s), displaying 301 to 312
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
AusNet Services (Distribution) - Cost allocation method 2019
AusNet Services’ (distribution) cost allocation method governs the manner in which it is allowed to allocate costs to the distribution services it provides.
Type
Cost allocation methods
Status
Historical
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
Murraylink - Connection charge pass through 2018-19
AER's decision on Murraylink’s cost pass through application.
Type
Cost pass throughs
Status
Historical
AusNet Services - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 3
Type
Contingent projects
Status
Current
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Jemena Gas Networks (NSW) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical