Final decision

On 30 April 2025, we released our final decision on Ergon Energy’s electricity distribution determination for the 2025–30 regulatory control period. 

Our final decision is set out in the Overview and accompanying attachments. As a number of issues were settled at the draft decision stage or required only minor updates, we have not prepared all attachments.

In these circumstances our draft decision reasons form part of this final decision.

On 17 November 2026 we published our determination to revoke and substitute our final decision on Ergon Energy’s electricity distribution determination for the 2025–30 regulatory control period. A material error we had made was identified that impacted the Ancillary Network Services final decision prices which were set too low. The revocation and substitution determination addressing this error can be found here.

View documents

Tariff Structure Statement and Indicative Network Prices

Final decision - Ergon Energy distribution determination 2025-30 - Revised Tariff Structure Statement - April 2025 - Clean

Content type
Document

Final decision - Ergon Energy distribution determination 2025-30 - Revised Tariff Structure Statement - April 2025 - Marked Up

Content type
Document

Final Decision - Ergon Energy - 9.01 - Revised 2025-30 Indicative network prices - April 2025

Content type
Document

Models

The following models relate to Ergon Energy's final decision.

View documents

Consultant reports

We commissioned the following report, which we took into account when making our final decision for Ergon Energy. 

AER - Final Decision - Ergon Energy - 2025-30 Distribution determination revenue proposal - DAE - Labour price growth forecasts - March 2025

Authors
Deloitte Access Economics (DAE)
Content type
Document

Update – Revocation and substitution determination for Ergon Energy’s Ancillary Network Services pricing errors 2026

On 17 November 2026, the AER published its revocation and substitution determination for Ergon Energy’s 2025–30 regulatory control period. This corrected a material error we had made relating to final decision fee-based Ancillary Network Services (ANS) prices which were set too low.

Our revocation and substitution determination, and the ANS model updated to correct the ANS errors, are below. The ANS model updated for the corrections includes the appropriate formulas in the calculation fee-based worksheet, with inflation and labour cost escalators incorporated into the final ANS price caps and 2025–26 prices.

All other aspects of the AER’s final determination remain as were made on 30 April 2025.

AER – Revocation and Substitution of Energex and Ergon Energy’s 2025–30 distribution determinations

Authors
AER
Content type
Document

AER Final Decision – Ergon Energy - 11.07 - Standardised ANS Model 2025-30 - updated for revocation of ANS errors

Authors
AER
Content type
Document