Overview

Regulatory proposal

On 28 January 2021, Powerlink Queensland submitted its revenue proposal for the 2022–27 regulatory control period, from 1 July 2022 to 30 June 2027.

Powerlink - TRP 2022-27 - Revenue Proposal Overview - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Revenue Proposal - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Cover Letter - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Cost Allocation Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 1.01 - Board Certification of Key Inputs and Assumptions - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 1.02 - Statutory Declaration on Powerlink's Reset RIN Return - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 1.03 - National Electricity Rules (NER) Compliance Checklist - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 1.04 - RIN Compliance Checklist - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 1.05 - Document Register - January 2021

Authors
Powerlink
Content type
Document

Confidentiality claims

Powerlink - 2022-27 - Confidentiality Register - January 2021

Authors
Powerlink
Content type
Document

Regulatory information notice

KPMG - TRP 2022 -27 - Reset RIN Review Opinion - January 2021

Authors
Powerlink
Content type
Document

KPMG - TRP 2022-27 - Reset RIN Audit Opinion - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Basis of Preparation - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Corporate Structure - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Map of Powerlink's Transmission Network - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Maximum Demand Forecasting Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - RIN - Workbook 1 - Forecast - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2013 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2014 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2015 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2016 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2017 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2018 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2019 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - workbook 2 - MIC - 2020 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - RIN - Workbook 3 - Recast category analysis - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - RIN - Workbook 4 - Recast economic benchmarking - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - Workbook 5 - CESS - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - Workbook 6 - EBSS - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2023-27 - RIN - Workbook 7 - Indicative bill impacts - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - RIN - Workbook 8 - Capex historical - January 2021

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Managers Agreement 2018 - November 2017

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Managers Agreement 2021 - December 2020

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Working at Powerlink Agreement 2018 - November 2017

Authors
Powerlink
Content type
Document

Powerlink - TRP 2022-27 - Working at Powerlink Agreement 2020 - October 2020

Authors
Powerlink
Content type
Document

Models

Powerlink - Post-Tax Revenue Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Roll-Forward Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Capex Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Repex Forecast Model 2020 Profile - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Repex Calibration Model 2015 Profile - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Trend Based Capex Forecast - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Operating Expenditure Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CESS Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - EBSS Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Rate of Return Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Depreciation Tracking Module - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Age Profile 1 Towers - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Age Profile 2 Switchgear - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Age Profile 3 Secondary Systems - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Calibration Quantity 1 Towers - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Calibration Quantity 2 Switchgear - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Calibration Quantity 3 Secondary System - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Input TowerData - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Input TowerRefurbProjection - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Output Category TowersComplete ByYear - January 2021

Authors
Powerlink
Content type
Document

Supporting information - Appendices

Powerlink - Appendix 2.01 - Business Narrative - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.01 - Engagement Plan - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.02 - Submissions on our draft Revenue Proposal - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.03 - Customer Panel Statement on Engagement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.04 - Terms of Reference for the Revenue Proposal Reference Group - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.05 - Customer Panel Evaluation Survey - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.06 - Stakeholder Perception Survey 2020 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 3.07 - Transmission Network Forum Participant Feedback Summary 2020 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - HoustonKemp - Appendix 4.01 - HoustonKemp Efficiency of Powerlink's Base Year Operating Expenditure Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.01 - Operating and Capital Expenditure Criteria and Factors - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.02 - 2020 Transmission Annual Planning Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.03 - Expenditure Forecasting Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.04 - Non-Load Driven Network Capex Forecasting Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.05 - IT Plan 2023-27 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.06 - Guide to Non-Network Capital Expenditure - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 5.07 - Contingent Projects - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 6.01 - Forecast Operating Expenditure Methodology and Model - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 6.02 - Operating Expenditure Productivity Approach and Potential Initiatives - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 6.03 - Operating Expenditure Step Changes Approach - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Marsh - Appendix 6.04 - Marsh Insurance Projections - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Incenta - Appendix 6.05 - Incenta Benchmark Debt and Equity Raising Costs Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - BISOE - Appendix 7.01 - BISOE Labour Cost Escalation Forecasts to FY2027 Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - GHD - Appendix 7.02 - GHD Unit Rates for Repex Modelling Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 7.03 - Cost Estimating Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 9.01 - Nominated Averaging Periods - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 10.01 - Depreciation Tracking Approach - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Marsh - Appendix 12.01 - Marsh Nominated Pass Through Events - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 15.01 - Setting STPIS Values - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Energy Networks Australia - Appendix 15.02 - Energy Networks Australia STPIS Review Letter - January 2021

Authors
Powerlink
Content type
Document

Powerlink - WSP - Appendix 15.03 - Statistical Methodology for STPIS SC Validation Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 16.01 - Proposed Pricing Methodology - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 16.02 - Transmission Pricing Consultation Paper - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 16.03 - Transmission Pricing Consultation Draft Positions Paper - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 16.04 - Transmission Pricing Consultation Final Positions Paper - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Appendix 16.05 - Submissions to Powerlink's Transmission Pricing Consultation Paper - January 2021

Authors
Powerlink
Content type
Document

Supporting information - Documents

In addition to the files below, Powerlink submitted:

  • Powerlink - Asset Management Plan 2021 - Volume 2 Investment Outlook - January 2021 
  • Powerlink - Asset Management Plan 2021 - Volume 3 Area Plans - January 2021
  • Powerlink - CP.02644 Calliope River to Wurdong 275kV Transmission Line Refit - January 2021
  • Powerlink - CP.02723 Ross 275kV Primary Plant Replacement - January 2021

These files are too large to upload to our website but we can provide them on request. Please email Powerlink2022ataer [dot] gov [dot] au (Powerlink2022[at]aer[dot]gov[dot]au) if you would like a copy of any of the above files.

Powerlink - Asset Maintenance Standard - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Management Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Management Plan 2021 - Volume 1 Overview - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Management Policy - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Management Strategy - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Planning Criteria Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Refurbishment Standard - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Asset Risk Management Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Co Design Workshop Summary Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.01656 Calliope River to Larcom Creek 275kV Transmission Line Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02356 Lilyvale Transformer 3 & 4 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02360 Nebo Transformers 3 and 4 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02369 Blackwater Transformer 1 & 2 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02370 Tully Transformer 2 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02371 Bouldercombe Transformer 1 & 2 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02392 Woolooga Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02415 Greenbank to Mudgeeraba 275kV Transmission Line Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02478 South Pine no. 5 Transformer Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02512, CP.02513, CP.02514, CP.02822 OpsWAN Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02584 Tarong Transformers 2 & 3 Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02649 Redbank Plains Transofmrers Upgrade - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02694 Gladstone South to Callemondah 132kV Transmission Line Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02727 Gladstone South Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02750 Ross to Chalumbin 275kV Transmission Line Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02751 Murarrie Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02754 Davies Creek to Bayview Heights 275kV Transmission Line Refit - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02756 Molendinar Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02760 Middle Ridge Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02765 Broadsound Bus Reactor - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02771, CP.02811, CP.02812, CP.02813 Telecommunications Network Consolidation - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02778 Calliope River to Wurdong Tee 275kV Transmission Line Rebuild - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02796 Goodna Secondary System Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02814 Managing Southeast Queensland Voltages - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.02817 Teebar Creek Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.xxxxx Calvale Selective Primary Plant Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.xxxxx Greenbank Secondary Systems Replacement - January 2021

Authors
Powerlink
Content type
Document

Powerlink - CP.xxxxx Woree to Kamerunga 132kV Transmission Line Rebuild - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Digital Asset Management Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Future Workplace Options Analysis Report - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Guide to Network Capital Expenditure Project Packs - January 2021

Authors
Powerlink
Content type
Document

Powerlink - HV Underground Cable Asset Methodology Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT01 Supply Chain and Works Management 2022-27 - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT02 Payroll - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT03 Network Design Management - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT04 Information, Analytics and Insights - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT05 Stakeholder and Document Management - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT06 Technology Applications Sustainability - January 2021

Authors
Powerlink
Content type
Document

Powerlink - IT07 Cybersecurity Maturity - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Joint Planning Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Land Asset Methodology - Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Property, Plant and Equipment - Recognition - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Regulated Network Capital Investment Approval Guideline - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Reinvestment Criteria Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Stakeholder Engagement Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Substation Asset Methodology Framework - January 2021

Authors
Powerlink
Content type
Document

Powerlink - Transmission Line Asset Methodology Framework -January 2021

Authors
Powerlink
Content type
Document

Powerlink - Value Driven Maintenance Procedure - January 2021

Authors
Powerlink
Content type
Document

Issues paper

On 24 March 2021, we published an issues paper to assist stakeholders in their consideration of Powerlink Queensland's 2022-27 proposal.

AER - Issues Paper - Powerlink 2022-27 transmission revenue proposal - March 2021

Authors
AER
Content type
Document

Stakeholder forum

On 8 April 2021, the AER hosted an online public forum to allow stakeholders the opportunity to ask questions about Powerlink's 2022-27 transmission revenue proposal before submissions close on 24 May 2021. Presentations were delivered by the AER, the AER's Consumer Challenge Panel 23, Powerlink's Customer Panel, Energy Users Association of Australia and Powerlink. The presentation slides are available below.

AER - Presentation to public forum - April 2021

Authors
AER
Content type
Document

CCP23 - Presentation to public forum - April 2021

Authors
Consumer Challenge Panel (CCP) 23
Content type
Document

Powerlink Customer Panel - Presentation to public forum - April 2021

Authors
Powerlink Customer Panel
Content type
Document

EUAA - Presentation to public forum - April 2021

Authors
Energy Users Association of Australia (EUAA)
Content type
Document

Powerlink - Presentation to public forum - April 2021

Authors
Powerlink Queensland
Content type
Document

Submissions

-

We invited interested stakeholders to make a submission on Powerlink Queensland's 2022-27 revenue proposal and our Issues Paper by 24 May 2021. We received four submissions.

Aurizon - Submission on Powerlink Proposal and AER's Issues Paper - May 2021

Authors
Aurizon Network
Content type
Document

Consumer Challenge Panel 23 - Submission on Powerlink Proposal and AER's Issues Paper - May 2021

Authors
Consumer Challenge Panel (CCP) 23
Content type
Document

EUAA - Submission on Powerlink Proposal and AER's Issues Paper - May 2021

Authors
Energy Users Association of Australia (EUAA)
Content type
Document

Powerlink Customer Panel - Submission on Powerlink Proposal and AER's Issues Paper - May 2021

Authors
Powerlink Customer Panel
Content type
Document

Update - Demand Management Innovation Allowance Mechanism

On 9 July 2021, Powerlink requested the AER to not apply the Demand Management Innovation Allowance Mechanism (DMIAM) to its 2022-27 revenue determination.

On 23 August 2021, the AER received a stakeholder submission in response to Powerlink's request.

Powerlink - Non application of the DMIAM to the 2022-27 regulatory control period - 9 July 2021

Authors
Powerlink
Content type
Document

QEUN - Submission on Powerlink's application to exclude DMIAM from its 2022-27 revenue proposal - August 2021

Authors
Queensland Electricity Users Network (QEUN)
Content type
Document