Results
5231 result(s), displaying 5221 to 5231
Ausgrid - Determination 2024–29
Ausgrid electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Evoenergy (ActewAGL) - Determination 2024–29
Evoenergy revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open
Waratah Super Battery – SIPS battery service
Read our determination on the amounts to be paid to Transgrid for the System Integrity Protection Scheme battery service component of the WSB project.
Type
Determinations
Status
Current
The Trustee for Energy Bay Victor Fund - Fairfield City Central Shopping Centre application for individual retail exemption
On 16 May 2025, the AER accepted an application from The Trustee for Energy Bay Victor Fund for an individual exemption.
Type
Retail exemptions
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Hunter Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open