Results
17017 result(s), displaying 16945 to 16956
Waratah Super Battery – SIPS battery service
Read our determination on the amounts to be paid to Transgrid for the System Integrity Protection Scheme battery service component of the WSB project.
Type
Determinations
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
APA Victorian Transmission System - Access arrangement 2023–27
Gas access arrangement for APA Victorian Transmission System for the 2023–27 regulatory period
Type
Access arrangements
Status
Current
SUPA ENERGY PTY LTD - OAK ON HIGH network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
THE TRUSTEE FOR ENERGY TRANSITION INVESTMENTS FUND ALPHA TRUST 1 - GREENLINK INDUSTRIAL ESTATE network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
ENERGY TRADE PTY LTD - 161 HAWKESBURY ROAD network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
CitiPower, Powercor, and United Energy - Ring-fencing waiver - Electric vehicle charging infrastructure
The AER invites stakeholders to provide feedback on CPU’s application for a waiver from the Ringfencing guideline (electricity distribution) to provide EVCI.
Type
Ring-fencing
Status
Open
Jemena - Determination 2021-26
On 21 July 2025 Jemena withdrew its application to the AER to revoke and substitute its distribution determination for the 2021-26 regulatory control period.
Type
Determinations
Status
Current
Power and Water Corporation - Determination 2024–29
Power and Water Corporation electricity revenue determination 2024-29
Type
Determinations
Status
Current
TasNetworks - Determination 2024–29
TasNetworks electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Evoenergy (ActewAGL) - Determination 2024–29
Evoenergy revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Essential Energy - Determination 2024–29
Essential Energy electricity revenue determination 2024-29
Type
Determinations
Status
Current