Results
17017 result(s), displaying 16993 to 17004
ISPT Pty Ltd - Northlakes Shopping Centre application for individual retail exemption
On 18 September 2025, the AER accepted an application from ISPT Pty Ltd for an individual exemption.
Type
Retail exemptions
Status
Open
Ausgrid Community Power Network trial waiver application
Ausgrid’s proposal is the first trial application under the policy-led sandboxing approach launched by the AER in February 2025.
Type
Energy Innovation Toolkit
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
The Trustee for Energy Bay Victor Fund - Riverside Plaza application for individual retail exemption
On 29 August 2025, the AER accepted an application from The Trustee for Energy Bay Victor Fund for an individual exemption.
Type
Retail exemptions
Status
Open
Marinus Link - Intending transmission network application
Marinus Link intending Transmission Network Service Provider (TNSP) application and Commencement and Process Paper.
Type
Determinations
Status
Open
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
South Australia: December 2026 - February 2027
On 1 October 2025, AEMO notified the AER that the reliability gap for South Australia from 1 December 2027 to 28 February inclusive had closed.
Type
Retailer Reliability Obligation
Status
Revoked
Basslink - Determination 2025–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
Energex - Ring-fencing waiver- six battery energy storage systems - May 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Ergon Energy - Ring-fencing waiver- six battery energy storage systems - May 2025
Ergon Energy is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Minimum disconnection amount – 2025 review
The AER has reviewed the minimum disconnection amount for the National Energy Customer Framework, increasing it from $300 to $500, effective from 1 July 2026.
Type
Reviews
Status
Current