Results
17164 result(s), displaying 17137 to 17148
Meeting system strength requirements in NSW RIT-T dispute
The Centre for Independent Studies submitted a dispute notice on Transgrid’s Meeting system strength requirements in NSW RIT-T.
Type
RIT-T and RIT-D disputes
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retailer Reliability Obligation
Status
Current
PS703332F - FLAGSTAFF PLACE - 49-53 BATMAN STREET network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
Marinus Link - Intending transmission network application
Marinus Link intending Transmission Network Service Provider (TNSP) application and Commencement and Process Paper.
Type
Determinations
Status
Open
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current
APA Victorian Transmission System - Access arrangement 2028–32
Gas access arrangement for APA Victorian Transmission System for the 2028–32 regulatory period
Type
Access arrangements
Status
Open
The Trustee for Energy Bay Oscar Fund - Stockland Forster Shopping Centre application for individual retail exemption
On 12 September 2025, the AER accepted an application from The Trustee for Energy Bay Oscar Fund for an individual exemption.
Type
Retail exemptions
Status
Open
TasNetworks North West Transmission Developments Stage 1 (Construction) Contingent Project
On 31 October 2025, TasNetworks submitted its contingent project application seeking to increase its revenue to fund NWTD Stage 1 (Construction).
Type
Contingent projects
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Ausgrid Community Power Network trial waiver application
Ausgrid’s proposal is the first trial application under the policy-led sandboxing approach launched by the AER in February 2025.
Type
Energy Innovation Toolkit
Status
Open
Murraylink - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open