Results
17164 result(s), displaying 17161 to 17164
TasNetworks - Network support pass through 2024-25
The AER has determined TasNetworks' 2024-25 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2026-27
Type
Cost pass throughs
Status
Current
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN (SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
APA Victorian Transmission System - 2026 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2026 - 31 December 2026.
Type
Tariff variations
Status
Current