Results
17241 result(s), displaying 17221 to 17232
APA Victorian Transmission System - Access arrangement 2028–32
Gas access arrangement for APA Victorian Transmission System for the 2028–32 regulatory period
Type
Access arrangements
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Transgrid - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Transgrid can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
ElectraNet - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that ElectraNet can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Murraylink - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
Minimum disconnection amount – 2025 review
The AER has reviewed the minimum disconnection amount for the National Energy Customer Framework, increasing it from $300 to $500, effective from 1 July 2026.
Type
Reviews
Status
Current
Default market offer 2026–27
The DMO caps the prices a retailer can charge a standing offer customer. It also serves as a reference price for market offers in these regions.
Type
Reviews
Status
Open
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
AER's decision on TasNetworks' (distribution) September 2024 storm cost pass through application.
Type
Cost pass throughs
Status
Current
Enabling Central-West Orana Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Transgrid's proposal for the Enabling Central-West Orana REZ Network Infrastructure Project (the CWO Enabling RNIP)
Type
Determinations
Status
Open