Results
17241 result(s), displaying 17197 to 17208
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
South Australia: December 2026 - February 2027
On 1 October 2025, AEMO notified the AER that the reliability gap for South Australia from 1 December 2027 to 28 February inclusive had closed.
Type
Retailer Reliability Obligation
Status
Revoked
Energex - Ring-fencing waiver- six battery energy storage systems - May 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Ergon Energy - Ring-fencing waiver- six battery energy storage systems - May 2025
Ergon Energy is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
ISPT Pty Ltd - Northlakes Shopping Centre application for individual retail exemption
On 18 September 2025, the AER accepted an application from ISPT Pty Ltd for an individual exemption.
Type
Retail exemptions
Status
Open
ISPT Pty Ltd - Silkstone Village application for individual retail exemption
On 18 September 2025, the AER accepted an application from ISPT Pty Ltd for an individual exemption.
Type
Retail exemptions
Status
Open
SUPA ENERGY PTY LTD - MOMENT retail exemption
The Registrant's exemption from the requirement to hold a retailer authorisation under the National Energy Retail Law has now come into effect.
Type
Retail exemptions
Status
Current
Essential Energy - Ring-fencing waiver - establishing a training academy in regional NSW
The AER has received a ring-fencing waiver application from Essential Energy to support the establishment of a new training academy.
Type
Ring-fencing
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retailer Reliability Obligation
Status
Current
PS703332F - FLAGSTAFF PLACE - 49-53 BATMAN STREET network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current