Results
3750 result(s), displaying 1 to 12
Have your say on cost pass through applications from Endeavour Energy, Essential Energy and Ausgrid
We welcome submissions on these cost pass through applications by 21 August 2026.
Type
Communications
AER consults on 2026 draft Guideline about recovery of NSW Roadmap costs
Have your say on draft updates to our Contribution Determination Guideline to improve cost recovery arrangements under the Electricity Infrastructure Roadmap.
Type
Communications
AER commences consultation on the 2027 review of the Customer Export Curtailment Value Methodology
The AER is reviewing whether the customer export curtailment value methodology should be updated to reflect current and emerging DER value streams.
Type
Communications
Tickets now on sale for the 2026 ACCC/AER Regulatory Conference
To be held in Brisbane on 6–7 August 2026, this conference brings speakers from around the world to discuss emerging issues in regulatory theory and practice.
Type
Communications
Independent Panel’s report for the 2026 Rate of Return Instrument review
The report presents the Panel's assessment of the evidence and reasons supporting the draft RORI.
Type
Communications
AER makes a final determination on APA's advanced capital expenditure proposal
The Australian Energy Regulator today released a Final Determination on APA’s advance capex proposal to expand Victoria’s gas transmission pipeline capacity.
Type
Communications
Have your say on the Roma (Wallumbilla) to Brisbane access arrangement proposal by 19 August 2026
The AER opens consultation on APT Petroleum Pipelines Pty Limited's Roma (Wallumbilla) to Brisbane 2027–32 gas access arrangement transmission proposal.
Type
Communications
SUPA Energy Pty Ltd granted gas and electricity retailer authorisation
On 2 July 2026, the Australian Energy Regulator (AER) approved an electricity and gas retailer authorisation application from SUPA Energy Pty Ltd
Type
Communications
AER makes determination on Powerlink SoCI cost pass through application
We have published our determination on Powerlink’s pass through application for costs incurred due to physical security obligations under the SoCI Act reforms.
Type
Communications
Applications open to become a member of the AER’s Consumer Challenge Panel
Apply to join the AER’s Consumer Challenge Panel and help ensure consumer perspectives are heard in regulatory decisions. Applications close 3 August 2026.
Type
Communications
AER publishes 2025 Annual Ring-fencing Compliance Reports
Annual Ring-fencing Compliance Reports have been submitted by network service providers for 2025.
Type
Communications
AER ensures continued supply for former ZEN Energy customers
We've initiated the Retailer of Last Resort process that allows for the transfer of customers from Zen Energy to ensure continued energy supply.
Type
Communications