Results
829 result(s), displaying 37 to 48
Powercor - Determination 2026–31
Powercor is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Current
United Energy - Determination 2026–31
United Energy is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Current
AusNet Services’ cost pass through application – January 2026 bushfires
AusNet submitted a cost pass through application to recover costs incurred due to the January 2026 bushfires in Victoria. Submissions close 9 July 2026.
Type
Cost pass throughs
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN (SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Current
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Current
VIOTAS trial waiver application
The AER has granted a trial waiver to VIOTAS.
Type
Energy Innovation Toolkit
Status
Current
Enel X trial waiver application
The AER has granted a trial waiver to Enel X.
Type
Energy Innovation Toolkit
Status
Current
Basslink system security contract review application - May 2026
Basslink's application seeks an AER determination on whether the expenditure for proposed system security network support services is prudent and efficient.
Type
System security contract reviews
Status
Current
Transgrid system strength material change in circumstances
The AER confirms actions that Transgrid must take to address the material change in circumstances relating to its system strength regulatory investment test.
Type
Determinations
Status
Current
Evoenergy ring-fencing waiver - Provision of other services
This will allow Evoenergy to handover provision of other services by separating protection and control assets across the network boundary at a single site.
Type
Ring-fencing
Status
Current
AusNet Services – Cost Pass Through – Easement Land Tax 2026-27
The AER has made a determination for a positive pass through of easement land tax in 2026–27.
Type
Cost pass throughs
Status
Current
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current