Results
825 result(s), displaying 37 to 48
AusNet Gas Services - 2026–27 tariff variation notice
AusNet Gas Services (AusNet) has proposed new network prices to apply to its Victorian gas network for 2026–27.
Type
Tariff variations
Status
Open
Roma to Brisbane Pipeline - 2026–27 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline (transmission) for 2026–27.
Type
Tariff variations
Status
Open
Australian Gas Networks (Victoria and Albury) - 2026–27 tariff variation notice
Australia Gas Networks (Victoria and Albury) has proposed new network prices to apply to its Victorian gas network for 2026–27.
Type
Tariff variations
Status
Open
AusNet Services - Determination 2026–31
AusNet Services is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
AusNet Services’ cost pass through application – January 2026 bushfires
AusNet submitted a cost pass through application to recover costs incurred due to the January 2026 bushfires in Victoria. Submissions close 9 July 2026.
Type
Cost pass throughs
Status
Open
VIOTAS trial waiver application
The AER has granted a trial waiver to VIOTAS.
Type
Energy Innovation Toolkit
Status
Current
Enel X trial waiver application
The AER has granted a trial waiver to Enel X.
Type
Energy Innovation Toolkit
Status
Current
Transgrid system strength material change in circumstances
The AER confirms actions that Transgrid must take to address the material change in circumstances relating to its system strength regulatory investment test.
Type
Determinations
Status
Current
Evoenergy ring-fencing waiver - Provision of other services
This will allow Evoenergy to handover provision of other services by separating protection and control assets across the network boundary at a single site.
Type
Ring-fencing
Status
Current
AusNet Services – Cost Pass Through – Easement Land Tax 2026-27
The AER has made a determination for a positive pass through of easement land tax in 2026–27.
Type
Cost pass throughs
Status
Current
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current
TasNetworks - Ring-fencing waiver - Private Underground Electricity Cable data entry into Before You Dig Australia database - 2026
The AER grants a waiver to TasNetworks to record private underground electricity cables (PUECs) located on public land into Before You Dig Australia (BYDA).
Type
Ring-fencing
Status
Current