Results
810 result(s), displaying 13 to 24
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
TasNetworks - Network support pass through 2023-24
The AER has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
AusNet Services distribution cost pass through - September 2024 storm
AusNet Services has submitted a cost pass through application to recover the costs it has incurred as a result of the September 2024 storm.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Jasper cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Jasper.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Kirrily cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Kirrily.
Type
Cost pass throughs
Status
Current
Energex cost pass through application – South East Queensland storms
AER has made a determination on Energex’s South East Queensland storms cost pass through application.
Type
Cost pass throughs
Status
Current
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Ausgrid - Cost allocation method 2025
The AER has approved Ausgrid's revised cost allocation method.
Type
Cost allocation methods
Status
Current
Evoenergy - 2025–26 tariff variation notice
Evoenergy has proposed new network prices to apply to its ACT, Queanbeyan and Palerang gas network for 2025–26.
Type
Tariff variations
Status
Current