Overview

Revised proposal

On 20 January 2015, AusGrid submitted its revised proposal to the AER.

On 2 February 2015, Ausgrid submitted its amended proposal with amendment in Figure 30 on page 160 and following minor corrections:

  • Scale on Figures 1 and 2 corrected
  • Spelling error in Table 17 corrected
  • Comma deleted and full stop added on page 84

Ausgrid - Ausgrid Revised Regulatory Proposal (amended) - February 2015

Authors
Ausgrid
Content type
Document

Supporting information - Appendices

View documents

Submissions - on draft decision and revised proposal

-

Submissions in response to the draft decision and revised regulatory proposal closed on 13 February 2015.

View documents

Submissions - on public lighting draft decision

View documents

Consultation paper - Alternative mechanism for the recovery of the residual metering capital costs

AER - Consultation paper - Recovering the residual metering capital costs through an ACS annual charge - March 2015 View details

AER - Consultation paper - Recovering the residual metering capital costs through an ACS annual charge - March 2015_1.docx
DOCX (271.26KB)
AER - Consultation paper - Recovering the residual metering capital costs through an ACS annual charge - March 2015_1.pdf
PDF (548.54KB)
Authors
AER
Content type
Document

Submissions - to the consultation paper

-

Submissions on an alternative mechanism for the recovery of the residual metering capital costs to be incoporated in the NSW/ACT final decisions and Qld/SA preliminary decisions closed on 27 March 2015.

View documents

Late submissions - not being considered

AER - Letter to Ergon Energy - 2 April 2015.pdf

Authors
AER
Content type
Document

Ergon Energy - Submissions on NSW ACT and TAS draft decision

Authors
Ergon Energy
Content type
Document

AER - Letter to United Energy - 1 April 2015

Authors
AER
Content type
Document

United Energy - Submissions on NSW ACT and TAS draft decision

Authors
United Energy Distribution
Content type
Document