Project timeline

Draft determination

On 19 March 2026 the AER released its draft determination for the Default Market Offer for 2026–27 (DMO 8).

AER - Draft determination - Default market offer 2026–27 - 19 March 2026

Content type
Document

Consultant report

ACIL Allen supported us in the design of a forecasting approach for wholesale and environmental costs. The report Wholesale energy and environment cost estimates for DMO 8 draft determination by ACIL Allen was published alongside the draft determination on 19 March 2026.

ACIL Allen - Draft determination - Default market offer 2026–27 - Wholesale energy and environment cost estimates

Content type
Document

Cost assessment model

On 19 March 2026 the AER released its model for calculating DMO tariff caps and annual prices for 202627.

As set out in the DMO 8 draft determination, the AER uses a cost build-up approach to calculate the DMO tariff caps, taking into account forecast costs for wholesale electricity, network, environmental and retail costs, and applying a retail margin. We have assigned recovery of fixed costs to the daily supply charge and recovery of variable costs to the usage charges in the DMO tariffs.

The information contained in the model is set out in the DMO 8 draft determination, and we have published the model to provide stakeholders with additional transparency on how we propose to calculate the DMO tariff caps and annual prices for 2026–27.

AER - Draft determination - Default market offer 2026–27 - Cost assessment model

Content type
Document

Supplementary data

We requested AEMO provide the interval meter data used to simulate the load profiles and have published this data as supporting information alongside the DMO 8 draft determination. The data provided is at 30-minute intervals with both customer types aggregated (residential and small business), by DMO region. This provides transparency regarding a key input to our wholesale energy cost modelling, allowing stakeholders to consider inputs in more detail.

Additionally, to inform creation of the controlled load profiles for DMO 8, we requested interval meter controlled load profile data from distribution network service providers in each DMO region. This data has been published alongside the DMO 8 draft determination.

We have also published the DMO 8 assumed patterns of supply in Excel format.

AEMO - Default market offer 2026–27 - General use interval meter data

Content type
Document

Distribution network businesses - Default market offer 2026–27 - Controlled load interval meter data

Content type
Document

AER - Draft determination - Default market offer prices 2026–27 - Assumed pattern of supply

Content type
Document

DMO information kit

We have prepared an information kit to help explain the elements of the draft DMO 2026-27.

Information Kit - Draft Default Market Offer 2026-27

Authors
AER
Content type
Document

Submissions

-

We invited interested parties to make written submissions on the DMO 8 draft determination. Submissions closed on 9 April 2026. We received 19 submissions and one further confidential submission.

1st Energy - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
1st Energy
Content type
Document

AEC - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
Australian Energy Council (AEC)
Content type
Document

AGL - Submission - DMO 8 Draft Determination - 10 April 2026

Authors
AGL
Content type
Document

Alinta Energy - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
Alinta Energy
Content type
Document

Centre for Smart Power and Energy Research - Submission - DMO 8 Draft Determination - 1 April 2026

Content type
Document

Compliance Quarter - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
Compliance Quarter
Content type
Document

ECA - Submission - DMO 8 Draft Determination - 10 April 2026

Authors
Energy Consumers Australia (ECA)
Content type
Document

EnergyAustralia - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
EnergyAustralia
Content type
Document

ENGIE - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
ENGIE
Content type
Document

Hum Energy - Submission - DMO 8 Draft Determination - 13 April 2026

Content type
Document

JEC and ACOSS - Submission - DMO 8 Draft Determination - 13 April 2026

Authors
Justice and Equity Centre
Australian Council of Social Service (ACOSS)
Content type
Document

Local Volts - Submission - DMO 8 Draft Determination - 10 April 2026

Content type
Document

National Seniors Australia - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
National Seniors Australia
Content type
Document

Nectr - Submission - DMO 8 Draft Determination - 8 April 2026

Authors
Hanwha Energy Retail Australia Pty Ltd
Content type
Document

Origin Energy - Submission - DMO 8 Draft Determination - 13 April 2026

Authors
Origin Energy
Content type
Document

Powershop - Submission - DMO 8 Draft Determination - 13 April 2026

Authors
Powershop
Content type
Document

SACOSS - Submission - DMO 8 Draft Determination - 9 April 2026

Authors
South Australian Council of Social Service (SACOSS)
Content type
Document

Shopping Centre Council of Australia - Submission - DMO 8 Draft Determination - 13 April 2026

Authors
Shopping Centre Council of Australia (SCCA)
Content type
Document

South Australian Department for Energy and Mining - Submission - DMO 8 Draft Determination - 15 April 2026

Authors
SA Department for Energy and Mining
Content type
Document