Back to topOn 20 January 2015, AusGrid submitted its revised proposal to the AER.
On 2 February 2015, Ausgrid submitted its amended proposal with amendment in Figure 30 on page 160 and following minor corrections:
- Scale on Figures 1 and 2 corrected
- Spelling error in Table 17 corrected
- Comma deleted and full stop added on page 84
Documents (1) | Author |
---|---|
Ausgrid - Ausgrid Revised Regulatory Proposal (amended) - February 2015 ( PDF 3.63 MB ) | Ausgrid |
Supporting information - Appendices
Back to topSubmissions - on draft decision and revised proposal
Back to top27 November 2014 to 13 February 2015
Submissions in response to the draft decision and revised regulatory proposal closed on 13 February 2015.
Submissions - on public lighting draft decision
Back to topConsultation paper - Alternative mechanism for the recovery of the residual metering capital costs
Back to topSubmissions - to the consultation paper
Back to top20 March 2015 to 27 March 2015
Submissions on an alternative mechanism for the recovery of the residual metering capital costs to be incoporated in the NSW/ACT final decisions and Qld/SA preliminary decisions closed on 27 March 2015.
Late submissions - not being considered
Back to topDocuments (4) | Author |
---|---|
AER - Letter to Ergon Energy - 2 April 2015.pdf ( PDF 36.99 KB ) | AER |
Ergon Energy - Submissions on NSW ACT and TAS draft decision ( ZIP 5.04 MB ) | Ergon Energy |
AER - Letter to United Energy - 1 April 2015 ( PDF 51.74 KB ) | AER |
United Energy - Submissions on NSW ACT and TAS draft decision ( ZIP 5.01 MB ) | United Energy Distribution |