Draft decision
Back to topOn 26 October 2017, we released our draft decision on ElectraNet's transmission determination for the 2018–23 regulatory control period.
We also released a Fact Sheet to accompany and summarise our draft decision. The purpose of this Fact Sheet is to make our decision accessible to a wide-ranging consumer audience.
Consultant reports
Back to topReports commissioned by the AER in preparing our draft decision for ElectraNet:.
Documents (1) | Author |
---|---|
Partington and Satchell - Advice on AER equity beta update - September 2017 ( PDF 3.49 MB ) | Partington and Satchell |
Models
Back to topAER draft decision models for ElectraNet:
Submissions
Back to top26 October 2017 to 29 January 2018
We invited energy consumers and other interested parties to make submissions on our draft decision by 29 January 2018.
Stakeholder forum
Back to topWe held a pre-determination conference on our draft decision on Monday 6 November 2017 in Adelaide.
Documents (2) | Author |
---|---|
AER - ElectraNet pre-determination conference presentation - 6 November 2017 ( PDF 1 MB ) | AER |
Consumer Challenge Panel - ElectraNet pre-determination conference presentation - 6 November 2017 ( PDF 1.09 MB ) | Consumer Challenge Panel (CCP) |