Overview

Revised proposal

On 31 May 2007 ElectraNet lodged its proposed pricing methodology under the AER’s agreed interim requirements. Under the agreed interim requirements ElectraNet elected to have its proposed pricing methodology assessed against the AER’s pricing methodology guidelines published on 29 October 2007.

In the ElectaNet draft decision the AER decided not to approve ElectraNet’s proposed pricing methodology. ElectraNet was required to submit a revised proposed pricing methodology to the AER by 14 December 2007.

Revised proposed pricing methodology (14 December 2007)

Authors
ElectraNet
Content type
Document

Flinders Power

Authors
Flinders Power
Content type
Document

Major Energy Users

Authors
Major Energy Users Inc (MEU)
Content type
Document

Revised proposal

On 18 January 2008, ElectraNet submitted its revised revenue proposal in response to the AER’s draft decision on its electricity transmission determination for the regulatory control period  1 July 2008 to 30 June 1013.

During the AER's initial assessment an error was identified in relation to non-labour construction cost escalation (section 4.2.4), which it considered warranted correction for consultation. ElectraNet provided a revised revenue proposal (error corrected).

Cover letter

Authors
AER
Content type
Document

Revised revenue proposal

Authors
ElectraNet
Content type
Document

Cost information template

Authors
ElectraNet
Content type
Document

Other information template

Authors
ElectraNet
Content type
Document

Work in progress

Authors
ElectraNet
Content type
Document

Supporting information - Appendices to Revised Proposal

Appendix A1 - Director's responsibility statement

Authors
ElectraNet
Content type
Document

Appendix A2 - Transend's use of weather stations to support the real-time rating of transmission lines

Authors
ElectraNet
Content type
Document

Appendix A3 - BIS Shrapnel report, Outlook for land values in South Australia, January 2008

Authors
BIS Shrapnel
Content type
Document

Appendix A4 - CEG report, Escalation factors affecting capital expenditure forecasts - 18 January 2008

Authors
Competition Economists Group (CEG)
Content type
Document

Appendix A5 - Evans & Peck, Risk review of captial works program - supplementary report, January 2008

Authors
Evans and Peck
Content type
Document

Appendix A6 - Revised forecast network capital projects

Authors
ElectraNet
Content type
Document

Appendix A7 - Revised proposed contingent projects

Authors
ElectraNet
Content type
Document

Appendix A8 - CEG report, A methodology for estimating expected inflation, 15 January 2008

Authors
Competition Economists Group (CEG)
Content type
Document

Appendix A9 - Breakdown of network capital projects into component costs

Authors
ElectraNet
Content type
Document

Submissions - Submissions on draft decision and revised revenue proposal

Interested parties were invited to make submission on the AER's draft determination, and ElectraNet's Revised Revenue proposal. Five submissions were received.

ElectraNet Revenue Cap - draft decision

Authors
Electricity Supply Industry Planning Council (ESIPC)
Content type
Document

Submission of the AER's Draft Decision on ElectraNet's revenue Proposal

Authors
Transend Networks Pty Ltd (Transend)
Content type
Document

AER Draft Decision on ElectraNet SA Application

Content type
Document

Submission on the AER's Draft decision for ElectraNet's Revenue Proposal

Authors
Transgrid
Content type
Document

ElectraNet revised Revenue Proposal

Authors
Powerlink Queensland
Content type
Document