Use drop-down filter to search by keyword, region, sector, segment or status.
Results
Results
80 result(s), displaying 1 to 12
Atlas to Reedy Creek Pipeline
Atlas to Reedy Creek Pipeline's Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current
Darwin City Gate to Berrimah Pipeline
Darwin City Gate to Berrimah Pipeline's Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current
Silver Springs to Wallumbilla
Silver Springs to Wallumbilla Pipeline's Part 10 exemption
Type
Non-scheme pipeline exemptions
Status
Current
Churchie Pipeline
Churchie Pipeline's Part 10 exemption
Type
Non-scheme pipeline exemptions
Status
Current
Waggamba Pipeline
Waggamba Pipeline's Part 10 exemption
Type
Non-scheme pipeline exemptions
Status
Current
Moama Distribution Network
Moama Distribution Network was granted a Category 2 exemption under Part 10 of the National Gas Rules.
Type
Non-scheme pipeline exemptions
Reedy Creek Wallumbilla Pipeline
Reedy Creek Wallumbilla Pipeline's Category 2 Part 10 exemption revocation.
Type
Non-scheme pipeline exemptions
Status
Current
BP2 to GCH Interconnect
BP2 to GCH Interconnect's Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current
Kurri Kurri Lateral Pipeline
Kurri Kurri Lateral Pipeline's Part 10 exemption.
Type
Non-scheme pipeline exemptions
DLNG to PWC Upstream Pipeline
DLNG to PWC Pipeline's (Upstream Component) Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current
Bayu Undan to Darwin Pipeline
Bayu Undan to Darwin Pipeline's Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current
E04 Gas Pipeline
EO4 Gas Pipeline's Part 10 exemption.
Type
Non-scheme pipeline exemptions
Status
Current