On 27 November 2014, we released our draft decision on the revenue that TasNetworks may recover from its customers over the 2015–16 to 2018-19 regulatory control period.

We also released a Fact Sheet on our review of TasNetworks' proposal, to accompany and summarise our draft decision. The purpose of this Fact Sheet is to make our decision accessible to a wide ranging consumer audience.

View documents

Consultant reports

The AER commissioned a range of reports from consultants.

View documents

Models

The AER must publish certain models with its draft decision for TasNetworks.

AER Draft decision TasNetworks transmission determination - TasNetworks 2014 - post tax revenue model - November 2014

Authors
AER
Content type
Document

AER Draft decision TasNetworks transmission determination - TasNetworks 2014 - roll forward model - November 2014

Authors
AER
Content type
Document

AER Draft decision TasNetworks transmission determination - TasNetworks 2014 - opex model - November 2019

Authors
AER
Content type
Document

AER Draft decision TasNetworks transmission determination - TasNetworks 2014 - Economic Insights TNSP productivity - November 2014

Authors
Economic Insights Pty Ltd
Content type
Document

AER Draft decision TasNetworks transmission determination - Adjustments to RBA and BVAL curves illustrative example - November 2014

Authors
AER
Content type
Document

Submissions

-

Submissions in response to the draft decision and revised proposal closed 5pm AEDST 6 February 2015. Submissions can be found under the Revised Proposal milestone.

Stakeholder forum - pre-determination conference

On 27 November 2014, we published our draft decision for TasNetworks' transmission determination for the 2015-19 regulatory control period. After its release, we held a pre-determination conference in Hobart on 11 December 2014 to explain first hand to stakeholders our draft decision and what it means.

TasNetworks pre-determination conference - AER presentation - 11 December 2014

Authors
AER
Content type
Document

TasNetworks pre-determination conference - CCP sub-panel 6 presentation - 11 December 2014

Authors
Consumer Challenge Panel - Hugh Grant
Content type
Document

TasNetworks pre-determination conference - TasNetworks presentation (part 1) - 11 December 2014

Authors
TasNetworks
Content type
Document

TasNetworks pre-determination conference - TasNetworks presentation (part 2) - 11 December 2014

Authors
TasNetworks
Content type
Document